Kyle’s Project List
Here, you’ll find a list of construction projects on which I’ve had the honor of contributing to, either in the past or currently in progress.
Summary
Kyle is a seasoned professional excelling in overseeing large-scale construction projects, known for delivering predictable outcomes.
He has a diverse background managing projects across land development, commercial hospitality, and mixed-use, with a specialized focus on complex capital healthcare projects.
Core Competencies:
- Clear Communication
- Problem Solving
- Strategic Thinking
- Collaborative Leadership
- Lean Construction
#18: Los Robles Hospital | Seismic Compliance Projects | Thousand Oaks, CA | 2024
Project Executive | Layton Construction
Multi-phase renovations on every floor of (2) patient towers to allow for the installation of concrete shear walls going from building foundation to roof - to make existing buildings SPC-4D compliant. Plans also include temporary kitchen, 5,000 SF building expansion for new kitchen, and (11) underground tanks for NPC-5 compliance.
- Value: $85 Million
- Delivery: Early Design Involvement
- Industry: Healthcare
- Jurisdiction: OSHPD / HCAI
#17: Huntington Health | Medical Office Building | Pasadena, CA | 2024
Project Executive | Layton Construction
Removal of an existing 19,000 SF building and parking lot. Construction of a new 100,285 SF, 4-Story Medical Office Building with 3 levels of subterranean parking to provide 252 parking spaces.
- Value: $75 Million
- Delivery: Design-Bid-Build
- Industry: Healthcare
- Jurisdiction: Local City
#16: Providence St. Joseph Hospital | Intermediate Care Unit | Orange, CA | 2023-2024
Project Executive | Layton Construction
State-of-the-art renovation of a 21,120 SF shell space to create a new Intermediate Care Unit on 2nd floor of patient tower.
- Value: $12 Million
- Delivery: Design-Assist
- Industry: Healthcare
- Jurisdiction: OSHPD / HCAI
#15: Los Robles Hospital | Surgery Renovation | Thousand Oaks, CA | 2023 - Present
Senior Project Manager | Layton Construction
Complex multi-phased expansion/renovation of approximately 25,000 SF of space located in the heart of the hospital to allow for 10 enlarged operating rooms and a new lab.
- Value: $21 Million
- Delivery: Design-Bid-Build
- Industry: Healthcare
- Jurisdiction: OSHPD / HCAI
#14: Los Robles Hospital | Lab Relocation | Thousand Oaks, CA | 2023
Senior Project Manager | Layton Construction
Demolition of hospital’s existing morgue and construction of new 3,000 SF Histology / Cytology Lab. Second phase includes demolition of existing admin space and construction of new 2,000 SF Frozen Section Lab.
- Value: $7 Million
- Delivery: Design-Bid-Build
- Industry: Healthcare
- Jurisdiction: OSHPD / HCAI
#13: Los Robles Hospital | Emergency Department Expansion | Thousand Oaks, CA | 2023
Senior Project Manager | Layton Construction
Complex 25,000 SF multi-phased expansion/renovation of space located in the heart of the hospital for a new state-of-the-art emergency department. Project is built while keeping the hospital’s emergency department up and running.
- Value: $25 Million
- Delivery: Design-Bid-Build
- Industry: Healthcare
- Jurisdiction: OSHPD / HCAI
#12: Cedars Sinai Medical Center | Patient Healing Garden | Beverly Hills, CA | 2021-2022
Senior Project Manager | Layton Construction
Design and construction of a world-class state-of-the-art Patient Healing Garden concealed by a meandering steel fence and filled with steel and stone artwork. Garden supports patients inside a brand-new (26) bed critical care pediatric suite.
- Value: $6 Million
- Delivery: Design-Assist
- Industry: Healthcare
- Jurisdiction: OSHPD / HCAI
#11: Cedars Sinai Medical Center | SCCT Plaza Beds | Beverly Hills, CA | 2020-2022
Senior Project Manager | Layton Construction
Complex expansion/renovation of approximately 25,000 SF of space located in the Saperstein Critical Care Tower (SCCT) to allow for the addition of (26) high-end critical care patient beds.
- Value: $30 Million
- Delivery: Design-Assist
- Industry: Healthcare
- Jurisdiction: OSHPD / HCAI
#10: Cedars Sinai Medical Center | Mezzanine Respiratory Therapy & EVS Reno | Beverly Hills, CA | 2020-2022
Senior Project Manager | Layton Construction
Three-Phase renovation of approximately 10,000 SF of space located in the Saperstein Critical Care Tower to allow for a new Respiratory Therapy & EVS Department.
- Value: $6 Million
- Delivery: Design-Assist
- Industry: Healthcare
- Jurisdiction: OSHPD / HCAI
#09: Cedars Sinai Medical Center | Saul & Joyce Brandman Breast Center | West Hollywood, CA | 2020 - 2021
Project Manager | Layton Construction
30,000 SF 3-Level building world-class remodel and renovation of new breast center, including exterior.
- Value: $23 Million
- Delivery: Design-Bid-Build
- Industry: Healthcare
- Jurisdiction: City of West Hollywood
#08: Los Robles Hospital | Surgery Expansion & Reno | Thousand Oaks, CA | 2019 - 2021
Project Manager | Layton Construction
Complex 15,000 SF building expansion to allow for the addition of (2) state-of-the-art CV-OR rooms, new storage room, and clean supply room to the hospital’s surgery department. Project was built while keeping all adjacent departments up and running.
- Value: $18 Million
- Delivery: Design-Bid-Build
- Industry: Healthcare
- Jurisdiction: OSHPD / HCAI
#07: Los Robles Hospital | Imaging Department Relocation | Thousand Oaks, CA | 2019-2020
Project Manager | Layton Construction
State-of-the-art renovation of a 16,120 SF Imaging Department plus a 5,000 SF expansion to create a new pedestrian corridor and improve connectivity to the main facility. Project was built while keeping all adjacent departments up and running.
- Value: $15 Million
- Delivery: Design-Bid-Build
- Industry: Healthcare
- Jurisdiction: OSHPD / HCAI
#5/6: Valley Presbyterian Hospital | ED Expansion + ADA Campus Upgrades | Los Angeles, CA | 2017 - 2019
Project Manager | Layton Construction
Renovation and expansion of hospital’s operational emergency department. Project included adding 20,505 square feet of space, increasing the patient bed capacity from 24 to 34 beds, and modernizing patient and clinical areas to improve access, comfort and workflow.
- Value: $8.5 Million
- Delivery: Design-Bid-Build
- Industry: Healthcare
- Jurisdiction: OSHPD / HCAI
#04: Glendale Memorial Hospital | Patient Tower & Juncture Building Seismic Upgrades | Los Angeles, CA | 2017
Assistant Project Manager | Layton Construction
Miscellaneous structural & tenant improvements, seismic retrofit, ADA upgrades.
- Value: $10 Million
- Delivery: Design-Build
- Industry: Healthcare
- Jurisdiction: OSHPD / HCAI
#03: Loma Linda University Medical Center | Misc. Tenant Improvements | Loma Linda, CA | 2017-2018
Assistant Project Manager | Layton Construction
5+ projects. Renovate, & upgrade existing spaces such as operating rooms, security department check-in, pedestrian grand entrance, nursery, NICU, and PACU for increased functionality and comfort.
- Value: $7.5 Million
- Delivery: Design-Bid-Build
- Industry: Healthcare
- Jurisdiction: OSHPD / HCAI
#02: The Faena West of Collins Project - Atlantic Hotels | Miami Beach, FL | 2014 - 2017
Project Engineer | Layton Construction
Three ground-up buildings for the three block site – a performing arts center, retail bazaar, and parking structure. These distinct functions are linked by a sequence of public domains including a plaza, courtyard and marina dock.
- Value: $100 Million
- Delivery: Design-Bid-Build
- Industry: Hospitality
- Jurisdiction: Local City
#01: Colorado I-25 North Expansion Project | Colorado Springs, CO | 2013
Field Engineer | Kiewit Infrastructure
Addition of (1) and (2) lanes along 21 miles of major interstate highway and construction of (2) cast-in-place concrete bridges.
- Value: $67 Million
- Delivery: Design-Bid-Build
- Industry: Heavy Civil
- Jurisdiction: State of Colorado